Select Page

ULVAC DA-241 9.2 cfm Oil-Free Diaphragm Pump

3,490.00$

Manufactured and imported directly from Japan, ULVAC DA series diaphragm pumps creates vacuum by reciprocate movement of rubber diaphragms. Various pumping speed and two/single stages are selectable depends on your required pressure and pumping volume. These pumps are oil-free, which means less maintenance and no more frequent and costly oil change, or cross contamination.

SKU: 4200764 Category: Tag:

Description

 Model
 ULVAC DA-241

 Electrical requirements
 110V 50/60Hz or 220V 50/60Hz single phase, 400 watts

 Full load current
 6.0 amps

 Pumping rate
 9.2 cfm

 Ultimate vacuum level
 120 torr

 Inlet/Outlet
 5/8″ hose barb

 Adjustable vac./gas ballast
 No

 Unit/shipping dimensions (LxWxH)
 8 x 16 x 11″ / 18/11/14.5″

 Unit/shipping weight
 58 Lb / 63 Lb

 Working environment
 32°F to 104°F (0°C to 40°C)

 Noise level
 70 dBA at near Atmospheric pressure 65 dBA at ultimate pressure

 Certification
 CE, TUV

Your Cart