Select Page

ULVAC DA-40S 1.6 cfm Oil-Free Diaphragm Pump

$1,190.00

Manufactured and imported directly from Japan, ULVAC DA series diaphragm pumps creates vacuum by reciprocate movement of rubber diaphragms. Various pumping speed and two/single stages are selectable depends on your required pressure and pumping volume. These pumps are oil-free, which means less maintenance and no more frequent and costly oil change, or cross contamination.

SKU: 4200762 Category: Tag:

Description

Model
ULVAC DA-40S

Electrical requirements
110V 50/60Hz or 220V 50/60Hz single phase, 60 watts

Full load current
0.8 amps

Pumping rate
1.62 cfm (60Hz), 1.41 cfm (50Hz)

Ultimate vacuum level
149 torr

Inlet/Outlet
3/8″ hose barb

Adjustable vac./gas ballast
No

Unit dimensions (LxWxH)
13 x 5 x 7″

Unit weight
16 Lb

Working environment
44.6°F to 104°F (7°C to 40°C)

Certification
CE, TUV

0
    Your Cart
    Your cart is emptyReturn to Shop